KENT · NODE KNT-04

Fixed Wire Testing in Medway

Commercial-grade periodic testing of the building's fixed wiring, identifying degradation before it becomes a fault or a hazard.

BS 7671 Part 6
out-of-hours available
NICEIC Approved
Why Medway

Local engineers, not a subcontracted callout

01

Out-of-hours scheduling

Testing arranged around production lines, trading hours or occupied premises rather than forcing a shutdown.

02

Phased testing for large sites

Multi-floor or multi-unit sites can be tested in phases so no single day loses full power.

03

Full documentation

Circuit schedules and test results delivered as a complete pack, not just a pass/fail summary.

Also covering: Canterbury Maidstone Guildford Woking
Common questions

Fixed Wire Testing in Medway — FAQ

Does fixed wire testing mean a full power-down?

Not necessarily — much of the installation can be tested live or in short isolated sections, we'll scope this at survey.

How is this different from an EICR?

An EICR is the overall condition report; fixed wire testing is the detailed circuit-level verification that underpins it.

What's the typical interval?

5 years for most commercial premises, shorter for higher-risk environments like industrial or agricultural sites.

Related

Book fixed wire testing in Medway

Send the site postcode and we'll confirm a survey slot and fixed price.