Commercial-grade fixed wire testing across the permanent installation — distribution boards, cabling and terminations verified to BS 7671 Part 6.
Testing arranged around production lines, trading hours or occupied premises rather than forcing a shutdown.
Multi-floor or multi-unit sites can be tested in phases so no single day loses full power.
Circuit schedules and test results delivered as a complete pack, not just a pass/fail summary.
Not necessarily — much of the installation can be tested live or in short isolated sections, we'll scope this at survey.
An EICR is the overall condition report; fixed wire testing is the detailed circuit-level verification that underpins it.
5 years for most commercial premises, shorter for higher-risk environments like industrial or agricultural sites.
Send the site postcode and we'll confirm a survey slot and fixed price.