NICEIC APPROVED · DOMESTIC & LANDLORD EICR

Domestic EICR in High Wycombe

Electrical Installation Condition Reports for landlords, homeowners, buyers and sellers in High Wycombe, Buckinghamshire (HP13). Fixed prices from £80 + VAT, testing to BS 7671:2018+A3:2024 and a digital report with clear C1, C2, C3 and FI coding within 1–3 working days.

WHAT AN EICR COVERS

A clear condition report for your property

  • Consumer unit, protective devices and earthing arrangements
  • Accessible wiring, sockets, switches and fixed equipment
  • Electrical observations coded C1, C2, C3 or FI
  • Digital report with recommended next steps
FIXED PRICE
£80 + VAT from

Studio to three-bedroom homes with one consumer unit. HMOs from £149 + VAT. Remedial work is quoted separately and itemised.

POSTCODES SERVED

High Wycombe postcode coverage

Appointments are available across the listed outward postcode districts.

HP13

Neighbouring postcode districts

Outward codes used by the nearest covered towns and villages.

HP11HP12HP13HP14HP15
DOMESTIC EICR USES

Inspection support for every stage of ownership

Homeowners

Understand the condition of an older installation before planning upgrades, renovations or a consumer unit replacement.

Landlords

Obtain the condition report needed to demonstrate electrical safety in rented homes and resolve coded observations.

Buyers & sellers

Check the fixed electrical installation before exchange or provide a recent report to support a smoother sale.

EICR QUESTIONS

EICR in High Wycombe: frequently asked questions

How much does an EICR cost in High Wycombe?

A domestic or landlord EICR in High Wycombe costs from £80 + VAT for a studio to three-bedroom home with one consumer unit. HMOs start from £149 + VAT. Larger homes are priced on consumer units and circuits, and you receive a fixed price before booking.

Do landlords in High Wycombe need an EICR?

Yes. Private landlords in England must have the electrical installation inspected and tested at least every five years, give a copy of the report to tenants within 28 days and complete any C1, C2 or FI remedial work within 28 days.

How long does a domestic EICR take?

Most flats and small houses in High Wycombe take two to four hours on site, with power off for short periods. The digital report is normally issued within one to three working days.

Which postcodes do you cover around High Wycombe?

We cover HP13 and the neighbouring postcode districts listed on this page. Our nearest local team covers High Wycombe from Slough, around 11 miles away, so appointments are usually available within a few working days.

Letting a commercial or mixed-use property? See EICR testing in Slough, the EICR cost guide or what to do after a failed EICR.

Book an EICR in High Wycombe

Send the postcode, number of bedrooms and preferred dates for a confirmed appointment and fixed price from £80 + VAT.

Request a quote