You’ll get a full or partial commercial rewire, designed around how the space is actually used rather than a like-for-like replacement.
Rewires on trading premises are planned in sections so the whole site isn't out of action at once.
Circuit layout is reviewed against actual current use, not simply mirrored from the old installation.
One team from first-fix through certification, rather than coordinating multiple subcontractors.
Often yes, phased by area — we'll scope what's realistic for your specific site at survey.
Entirely dependent on scale — a single unit might be days, a full building weeks; scoped properly at survey rather than guessed upfront.
Yes, circuit layout and load requirements are agreed and signed off before first-fix begins.
Send the site postcode and we'll confirm a survey slot and fixed price.